翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Ordish–Lefeuvre Principle : ウィキペディア英語版
Ordish–Lefeuvre system

The Ordish–Lefeuvre system, or Ordish–Lefeuvre principle, is an early form of cable-stayed bridge design, patented by Rowland Mason Ordish and William Henry Le Feuvre in 1858.
The Ordish–Lefeuvre system differs from conventional suspension bridges in that, while as with a conventional suspension bridge a parabolic cable supports the centre of the bridge, inclined stays support the remainder of the bridge's load. Each stay consists of a flat wrought iron bar attached to the bridge deck, and a wire rope connects the wrought iron bar to one of four octagonal support columns.
Only two major bridges were built using the Ordish–Lefeuvre principle. Ordish was commissioned to build Albert Bridge in Chelsea, London, using the design in 1864, but the start of work on the bridge was delayed due to negotiations regarding the proposed Chelsea Embankment at the northern end of the proposed bridge. While plans for the Chelsea Embankment were debated, Ordish built the Franz Joseph Bridge over the Vltava in Prague to the same design as that intended for Albert Bridge.
In 1870 work finally began on Albert Bridge, with construction expected to take roughly a year.〔 In the event, construction took over three years,〔 and the bridge opened with no formal ceremony on 23 August 1873, almost ten years after it had been authorised.〔
Albert Bridge was inspected in 1884 by Sir Joseph Bazalgette, Chief Engineer of the Metropolitan Board of Works, who found that the steel rods were already showing serious signs of corrosion. Over the next three years the steel staying rods were augmented with steel chains, giving it an appearance more closely resembling a conventional suspension bridge,〔 and a new timber deck was laid. Albert Bridge continued to suffer serious structural weakness and in 1972 the Greater London Council added two concrete piers in the middle of the river, supporting the central span and turning the central section of the bridge into a beam bridge.
Damaged through overuse during the Second World War, the Franz Joseph Bridge was demolished in the 1950s and replaced with a conventional bridge, leaving Albert Bridge the only surviving example of a significant bridge built using the Ordish–Lefeuvre principle.〔
==Notes and references==
;References
;Bibliography
*
*
*
*
*
*

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Ordish–Lefeuvre system」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.